Saturday October 22, 2022 Paradise Village Marina

Up late, almost 8 am. Breakfast the net and bible reading. Then off to the store for supplies. While we were out we got carnitas to go at a little shop near Chedraui where we stopped for beer. Then back for lunch.

We went to the other end of the marina, which is about a half hour walk past the mall. This walk should be about 20 minutes, but the state has closed all public boat ramps, which means the gates to that section of the dock are locked and we have to walk around. No one is exactly sure why this happened, but the suspicion is some one is looking for more money.  In any case, when we got there we noted that all the boat from A dock have been moved. Everyone is adding lines and checking stuff on deck and around their boats to prepare for the hurricane. Which as of just now when I checked is going to go north of us.

We talked to Jeff (my nephew who is in prison) and my mother in California. Then off to the pool with the other cruisers. Reneé made refried beans today. We will have dinner and hang out on the boat tonight. Depending on the weather tomorrow we might not go to church, we will see in the morning.

This is A dock in preparation for the hurricane, all the boats have been moved somewhere else
Our NEW (to us) toaster

Friday October 21, 2022 Paradise Village Marina

Up at 7 am, breakfast and the net, then bible reading. Today we have generator work scheduled. Storm (soon to be a hurricane) Rosalyn is headed our way, faster than expected so should be here tomorrow. Roughly 6 hours earlier than previously expected.
By 3:30 this afternoon, our generator was fixed!!! For all the details, check the blog entry GENERATOR SAGA. We went to the pool to celebrate, then back for dinner and a movie. Showers and bed.

No Pictures today

Generator repair saga October 17, 2022

In January of this year (yes it has been 10 months!) our MasPower 8kw generator failed. Our first thought was bad fuel. Another boat in the Panama Posse had issues with their fuel that had been gotten at the same dock as we had (La Cruz, near Puerto Vallarta) the fuel was dyed purple indicating no road tax etc. it felt gritty. We pumped out about 150 gallons and gave it away in Barra de Navidad, Mexico and refilled (at about 20 pesos to the liter for 160 gallons) bled the fuel system and tried a variety of fixes to the engine. I got a boroscope to look inside the tank while it was empty, looked very good.Nothing worked, generator still not working. Other issues, the control panel on the generator has a “button” that shifts the controls to a remote panel. That had pushed through the outside and part of it was missing. Discussing this with MasPower we determined that the panel “might” be the cause so we replaced that panel. Note: we are in Mexico so getting parts is more than a little difficult. Needless to say this did not fix the problem.
During this time, I had some illness (still unidentified) that put me down for about 2 months, I lost 25 lbs, and was severely fatigued. I have recovered, but I am still seeing a doctor about what it was.
Finally we started looking at what else it could be, with help from MasPower more diagnostics were done. We determined the Exciter coil was shorted and that repair part was a new generator end. As I said we are in Mexico, so the price of sending the generator back to them for rework was huge as in Not going to happen. We evaluated running the watermaker from a small generator and discovered that it is too big to run on a Honda 2200 generator. I looked for a generator repair person/team here in Banderas bay. I had someone in June who was able to confirm the exciter was bad and that I had wired the new control panel in correctly. So, I ordered the new generator end and had it shipped to the boat. This took about 6 weeks to get from Florida to the boat. We of course were back in the states by then.

When we got back to the boat in early October, I could not get the tech who had diagnosed the exciter to come back to the boat, or answer my calls. He had spent about 3 hours of his time working and not accepted any money, he said he would get paid when it worked. Oh well, he is one of about 3 or 4 that were involved that did not get paid, even when I was standing there wallet out and ready to pay.

So, here we were on the boat with a new generator end in a box on deck and a broken generator in the engine room. This is a bigger job than I want to tackle. So, I turned to Facebook and the local sailors for recommendations for someone to work on the generator. After a half dozen failed attempts I found a group Richards Marine Service who came down and gave us an estimate and showed up today (Monday 10/17/22). By noon they had the box off the generator and out of the engine room, they had also found out the bearing on the back end was bad which is what caused the exciter coil to fail.

$600 fuel in Barra (this is approximate, 160 gallons at 20+pesos to the liter and ~20 pesos to the dollar), the fuel wasn’t bad.

$229.43 for the controller

$76.94 for the import tax and shipping in Mexico

$2418.68 for the generator

725.40 for import tax and shipping in Mexico

$1,280 INSTALL ESTIMATE

10/21/2022

The repair shop for the exhaust mixing elbow repaired both the original and the one I we installed in 2018. Both came directly from MasPower, one on the generator when new (?) the other purchased in 2018. Both have a piece inside to direct the seawater in the direction of the exhaust, in the case of the original, this piece is broken off so the sea water just goes straight into the exhaust. What I was told is that the original, while it won’t leak exhaust into the engine compartment, won’t last very long if used. We are putting it in the storage for spare parts.
I was told the cost to have a mixing elbow made of stainless steel 3,500 pesos, about $175 US. This compares to $210 that I paid in December 2018 for a steel one. 

So, this generator came with NO instructions on how to hook it up. The three guys looked at the old one (they took pictures) and did the best they could, when they had it ready to run, they tested it and only got 81 volts. We tried hooking up a charger to the battery, and  it still only got to 81 volts. We called Mastry and walked through the connections to the voltage regulator where we discovered that the two GREEN wires from the exciter were NOT supposed to be hooked up to the regulator, rather the two wires that came from the breaker were supposed to be used. So, those two green wires are supposed to be left unused capped and insulated. Generator tested SAT! Frequency runs a bit high, but voltage is correct and it runs!!!! Total repair bill was $1,462, the extra $182 was for parts, repairing the exhaust mixing elbow, and installing the raw water impeller on the generator and the engine. 

The new generator
The information plate for the generator
The new generator in the box
This is the old generator, note the shinny spot. That was metal to metal contact. Not good.
The old generator
This is the old generator, note the shinny spot. That was metal to metal contact. Not good.
Working on the old generator getting the sound proof box out.
The new generator rotor
The new generator stator
The new exciter coil and bearing
The new generator installed
The old generator
One of the guys working on the generator

Thursday October 20, 2022 Paradise Village Marina

Up at about 7:30. Breakfast and the net. Bible reading after that.

We are getting reports of an earthquake in Panama and a hurricane expected in the next couple of days.

I have been communicating with Richard’s guys (generator repair) and John Pounder (rewire of stereo and XM). The generator repair is scheduled for tomorrow, and the stereo work on Tuesday (as always plans are written in the sand at low tide).

We have a load of laundry in the washer and Reneé is making bread today. There is a presentation today at 4 pm dealing with weather for the summer and especially the hurricane. Danny and Robin (SV All Set For Now), are due at 5:30 and will go with us to the potluck at 6 pm. At this point I would say a pretty busy day for us.

Danny and Robin backed out today, they have stuff to do getting ready for the hurricane. We filled the water tank. Reneé made a load of bread. I cleaned the bilge. So, what that means, outside temp is 97°F and 56% humidity, with the hatches open and AC off (it’s AC or water maker not both) it is 94°F and 60% humidity. We will be done soon and get the AC back.

By 3:45, the water tank was full, 143 gallons of 2 ppm water added to top off our 260 gallon tank. Just a bit more than 4 hours start to finish. We got the AC on, and relaxed for a couple of hours then went to the potluck. A major topic of discussion was the approaching hurricane. It is tracking for Puerto Vallarta, and is expected late Saturday/early Sunday morning.

Distance to Panama, where the earth quake was
Hurricane Forecast 3 days out
The tropical depression today 10-20-22

Wednesday October 19, 2022 Paradise Village Marina

Up at 7 am, breakfast the net, and off to catch the bus. Today the traffic was terrible, our driver for the first half decided to take a short cut and saved about 20 minutes. We were still late. The Bible study was led by a YWAM representative. The study was the second lesson of three on the book of Philemon, it’s a very short book, with only 1 chapter and only 25 verses.

After the study, we walked to Brenda’s restaurant for lunch then to Bob and Iris’s for the pool party.

Finally back to the boat by 4pm, where we did nothing for the rest of the day. Showers then bed.

No Pictures today